Goorambat East Solar Farm R1/R2

Goorambat East Solar Farm is a 250MW utility-scale project in Victoria. Grid-Link was engaged by Bouygues and Engie as grid connection partner from R1 registration through to R2 testing and reporting.

PROJECT SCOPE
  • R1 package preparation and due diligence
  • Hold point testing and R2 reporting
  • Grid Compliance Monitoring Plan (GCMP)
  • Liaison with OEMs, the NSP and AEMO
  • Engineering compliance support during construction
CHALLENGES
  • Inverter model change during the R1 process
  • Connection to a new 220kV terminal station
  • Tight AEMO R2 requirements under live commissioning conditions

OUTCOME

WE

CONNECT.

Grid-Link successfully achieved R1 registration and completed hold point testing for this new large-scale solar farm, managing an inverter change and a new terminal station connection without derailing the connection pathway.