Muranu Switching Station - Detailed Design

Engineering design for the Muranu 275kV Switching Station, delivered for Powerlink Queensland to connect the Boulder Creek Wind Farm to the 275kV transmission network.

PROJECT SCOPE
  • Electrical primary design for the 275kV switching station
  • Civil and structural design in accordance with Powerlink standards
  • Design support for the 275kV transmission line cut-in
  • Engineering coordination across project delivery
CHALLENGES
  • Familiarisation with Powerlink systems, templates and design standards
  • Tight delivery schedules for design packages
  • Conductor rating discrepancy between design advice and catalogue data
  • Complex civil conditions including steep terrain and easements

OUTCOME

WE

DESIGN.

Grid-Link successfully delivered the electrical, civil and structural design for the Muranu 275kV Switching Station, enabling connection of the Boulder Creek Wind Farm to the Powerlink network.